Difference between revisions of "Pre-Assessment"

From Tranzman Documentation
Jump to: navigation, search
Line 1: Line 1:
  
== Headline==
+
=== Introduction to Assessment report ===
The Tranzman Appliance can be used to carry out Pre-Assessment checks, allowing consultants to highlight pre-existing issues in the backup environment which needs to be resolved  
+
The Tranzman Appliance helps pre-validation and Site survey easy and simple through a series of automated checks in TZM Pre-Assessment.
before the migration takes place.
+
This helps consultants to highlight pre-existing issues in the backup environment and can be pro-actively resolved before the start of  migration.
  
===Step 1===
+
* The number of checks performed depends on the personality used and the origin and destination environments.
 +
* <i>Same Vendor Migration</i> has additional checks than other migrations. New checks are added often and always suggest to use latest patch to benefit from the latest checks.
 +
* When doing <i>SPLITS</i> or <i>MERGERS</i>, make sure to verify all the results in each migration pair.  Additional care should be taken while merging objects with the same name in multiple environments.
 +
* In case no immediate fix is available for any issue reported to Stone Ram Support, then those will be added in new checks to provide  notification in advnace as part of <b>Pre-assessment</b>.
  
Go to <b>Validation</b> on the sidebar and click on <b>Pre-Assessment</b>.The page should look something like as shown below.
+
===Running <b>Pre-Assessment</b>===
  
 +
* Navigate to <b>Tasks</b> -> <b>Pre-Assessment</b> on TZM webconsole and start the <b>Pre-Assessment</b> report.
 +
* It also provides options to rerun individual test or the entire Assessment.
 +
* The <i>Logs</i> icon privides the latest Assessment activity logs.
  
[[File:AssessmentPage.JPG | border|1100x800px]]
+
====Running <b>Pre-Assessment</b> on NetBackup to NetBackup migration ====
 +
The <i>NetBackup</i> to <i>NetBackup</i> migration supports -
 +
* 28 Individual Checks to verify for pre-existing issues in the origin or destination.
 +
* 17 Comparison Checks to identify any issues in migrating the selected components in selections between the Origin and Destination.
 +
* 17 Advisory Checks to understand any limitations within the environment, this may require manual actions to overcome.
 +
* 9 Advisory comparison checks to help understand limitations / manual actions that may need addressing.
  
  
===Step 2===
+
===Analysing <b>Pre-Assessment</b> report===
  
 
Click on [[File:RefreshButton.JPG | border|40x40px]] and this should start the Assessment job.The page will show the progress of the Assessment job. Wait for the job to finish.
 
Click on [[File:RefreshButton.JPG | border|40x40px]] and this should start the Assessment job.The page will show the progress of the Assessment job. Wait for the job to finish.
Line 58: Line 69:
  
  
[[ Devices | Jump to Add Tape Library and NAS Connectors (For different vendor migration or recovery to files) ]]
+
----
 
+
{| class="wikitable"  style="margin:auto;width:100%;color:blue;text-align:center;borderstyle=ridge;"
[[ Transition Readiness | Jump to Check Transition Readiness (For same vendor migration ) ]]
+
|-
 
+
| [[Image:prev_icon.jpg|30px|link=Selections]]
[[ Migration Components | Return to Select Migration Components ]]
+
|| [[Image:next_icon.jpg|30px|link=Devices]]
 +
|}

Revision as of 18:09, 6 July 2023

Introduction to Assessment report

The Tranzman Appliance helps pre-validation and Site survey easy and simple through a series of automated checks in TZM Pre-Assessment. This helps consultants to highlight pre-existing issues in the backup environment and can be pro-actively resolved before the start of migration.

  • The number of checks performed depends on the personality used and the origin and destination environments.
  • Same Vendor Migration has additional checks than other migrations. New checks are added often and always suggest to use latest patch to benefit from the latest checks.
  • When doing SPLITS or MERGERS, make sure to verify all the results in each migration pair. Additional care should be taken while merging objects with the same name in multiple environments.
  • In case no immediate fix is available for any issue reported to Stone Ram Support, then those will be added in new checks to provide notification in advnace as part of Pre-assessment.

Running Pre-Assessment

  • Navigate to Tasks -> Pre-Assessment on TZM webconsole and start the Pre-Assessment report.
  • It also provides options to rerun individual test or the entire Assessment.
  • The Logs icon privides the latest Assessment activity logs.

Running Pre-Assessment on NetBackup to NetBackup migration

The NetBackup to NetBackup migration supports -

  • 28 Individual Checks to verify for pre-existing issues in the origin or destination.
  • 17 Comparison Checks to identify any issues in migrating the selected components in selections between the Origin and Destination.
  • 17 Advisory Checks to understand any limitations within the environment, this may require manual actions to overcome.
  • 9 Advisory comparison checks to help understand limitations / manual actions that may need addressing.


Analysing Pre-Assessment report

Click on RefreshButton.JPG and this should start the Assessment job.The page will show the progress of the Assessment job. Wait for the job to finish.


Assessmentprogress.JPG


Step 3

Once Pre-Assessment is finished the webpage should look like below where there will be two sections of Issues and Limitations.

Both sections of Issues and Limitations are further categorise in to Origin and Destination with respect to the test cases.

Any inconsistency in either Origin or Destination will be seen with a Warning.JPG icon.

Make sure to resolve all the highlighted inconsistencies before proceeding with the migration.


Pre-AssessmentPage.JPG


Step 4

Pre-Assessment also enables you to review your backup Environments configurations and Migration Plan

To view the Migration Plan go to Validation->Migration Plan.


MigrationPlan.JPG


To view summary of backup Environments go to Validation->Environments.


Environments.JPG


Note :- All the above steps are similar irrespective of type of migration.




Prev icon.jpg Next icon.jpg