Difference between revisions of "Pre-Assessment"

From Tranzman Documentation
Jump to: navigation, search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 +
<br>
 +
<br>
 +
<div style="background-color:#edf7ff; padding: 1.5rem; border-radius:8px; max-width:80%; margin: 0 auto; margin-bottom:2rem;">
 +
  <h1 style="border-bottom:none; font-size:2.5em; font-weight:bold; text-align:center;">Pre-Assessment Report Overview</h1>
 +
  <p style="font-size:1.2em; text-align:left;">
 +
    The Tranzman Appliance streamlines pre-validation and site surveys using automated checks in the <b>TZM Pre-Assessment</b>.<br>
 +
    This process helps consultants identify and resolve pre-existing issues in the backup environment before migration begins.
 +
  </p>
 +
</div>
  
βˆ’
=== Introduction to Assessment report ===
+
<div style="max-width:80%; margin: 0 auto;">
βˆ’
The Tranzman Appliance helps pre-validation and Site survey easy and simple through a series of automated checks in TZM Pre-Assessment.
+
  <div style="background-color:#fffbf4; padding:1.5rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); margin-bottom:2rem;">
βˆ’
This helps consultants to highlight pre-existing issues in the backup environment and can be pro-actively resolved before the start of  migration.
+
    <h2 style="border-bottom:2px solid #ffe0b2; padding-bottom:0.5rem; font-size:1.5em;">Assessment Checks & Usage</h2>
 +
    <ul style="font-size:1.1em; margin-left:2em;">
 +
      <li>The number of checks depends on the migration personality and the origin/destination environments.</li>
 +
      <li><b>Same Vendor Migration</b> includes additional checks. Always use the latest patch for new checks.</li>
 +
      <li>For <b>SPLITS</b> or <b>MERGERS</b>, verify results for each migration pair. Take care when merging objects with the same name.</li>
 +
      <li>If no immediate fix is available for an issue, Stone Ram Support will add new checks to notify in advance as part of <b>Pre-Assessment</b>.</li>
 +
    </ul>
 +
    <div style="background-color:#f8e2b3; padding:0.2rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); font-size:1em; margin: 0 auto;">
 +
      <p>πŸ›ˆ <i>Always run the latest patch to benefit from the newest checks and notifications.</i></p>
 +
    </div>
 +
  </div>
  
βˆ’
* The number of checks performed depends on the personality used and the origin and destination environments.
+
  <div style="background-color:#fef3f7; padding:1.5rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); margin-bottom:2rem;">
βˆ’
* <i>Same Vendor Migration</i> has additional checks than other migrations. New checks are added often and always suggest to use latest patch to benefit from the latest checks.
+
    <h2 style="border-bottom:2px solid #f8bbd0; padding-bottom:0.5rem; font-size:1.5em;">Running Pre-Assessment</h2>
βˆ’
* When doing <i>SPLITS</i> or <i>MERGERS</i>, make sure to verify all the results in each migration pair.  Additional care should be taken while merging objects with the same name in multiple environments.
+
    <ol style="font-size:1.1em; margin-left:2em;">
βˆ’
* In case no immediate fix is available for any issue reported to Stone Ram Support, then those will be added in new checks to provide  notification in advnace as part of <b>Pre-assessment</b>.
+
      <li>Navigate to <b>Tasks &rarr; Pre-Assessment</b> in the TZM web UI and click <b>Start Pre-Assessment</b>.</li>
 +
      <li>Multiple checks are run; tests can be rerun to verify failed tests.</li>
 +
      <li>The <b>Logs</b> icon provides the latest assessment activity logs.</li>
 +
    </ol>
 +
    <div style="display:inline-block; box-shadow:5px 5px 10px grey; margin:1em 0;">[[File:Pre_assessment.jpg | 700px]]</div>
 +
    <div style="display:inline-block; box-shadow:5px 5px 10px grey; margin:1em 0;">[[File:Pre_assessment_result.jpg | 700px]]</div>
 +
  </div>
  
βˆ’
===Running <b>Pre-Assessment</b>===
+
  <div style="background-color:#eff8f0; padding:1.5rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); margin-bottom:2rem;">
 +
    <h2 style="border-bottom:2px solid #c8e6c9; padding-bottom:0.5rem; font-size:1.5em;">NetBackup-to-NetBackup Migration Checks</h2>
 +
    <ul style="font-size:1.1em; margin-left:2em;">
 +
      <li>28 Individual Checks for pre-existing issues in origin or destination.</li>
 +
      <li>17 Comparison Checks for migration component issues between origin and destination.</li>
 +
      <li>17 Advisory Checks for environment limitations (may require manual actions).</li>
 +
      <li>9 Advisory comparison checks for limitations/manual actions that may need addressing.</li>
 +
    </ul>
 +
  </div>
  
βˆ’
* Navigate to <b>Tasks</b> -> <b>Pre-Assessment</b> on TZM webconsole and start the <b>Pre-Assessment</b> report.
+
  <div style="background-color:#fffbf4; padding:1.5rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); margin-bottom:2rem;">
βˆ’
* It also provides options to rerun individual test or the entire Assessment.
+
    <h2 style="border-bottom:2px solid #ffe0b2; padding-bottom:0.5rem; font-size:1.5em;">Analysing Pre-Assessment Report</h2>
βˆ’
* The <i>Logs</i> icon privides the latest Assessment activity logs.
+
    <ul style="font-size:1.1em; margin-left:2em;">
 +
      <li><span style="color:#d32f2f;">Red triangle</span>: Issue to resolve or acknowledge (click for details).</li>
 +
      <li><span style="color:#616161;">Grey check</span>: Test ran without issue.</li>
 +
      <li><span style="color:#616161;">Grey dash</span>: Test not applicable/skipped.</li>
 +
      <li><span style="color:#1976d2;">Blue info</span>: More information, not critical.</li>
 +
      <li><span style="color:#388e3c;">Green check</span>: Test acknowledged.</li>
 +
    </ul>
 +
    <p><b>Note:</b> All Red triangle issues must be resolved, retested, or acknowledged before starting migration.</p>
 +
    <div style="display:inline-block; box-shadow:5px 5px 10px grey; margin:1em 0;">[[File:Pre_assessment_analyse.jpg | 700px]]</div>
 +
  </div>
  
βˆ’
====Running <b>Pre-Assessment</b> on NetBackup to NetBackup migration ====
+
  <div style="background-color:#fef3f7; padding:1.5rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); margin-bottom:2rem;">
βˆ’
The <i>NetBackup</i> to <i>NetBackup</i> migration supports -
+
    <h2 style="border-bottom:2px solid #f8bbd0; padding-bottom:0.5rem; font-size:1.5em;">Generating & Downloading Pre-Assessment Report</h2>
βˆ’
* 28 Individual Checks to verify for pre-existing issues in the origin or destination.
+
    <ol style="font-size:1.1em; margin-left:2em;">
βˆ’
* 17 Comparison Checks to identify any issues in migrating the selected components in selections between the Origin and Destination.
+
      <li>Go to <b>Tasks &rarr; Download</b> and click <b>Generate documents</b> to create the Pre-Assessment report.</li>
βˆ’
* 17 Advisory Checks to understand any limitations within the environment, this may require manual actions to overcome.
+
      <li>Report is generated only during the <b>Selections</b> phase.</li>
βˆ’
* 9 Advisory comparison checks to help understand limitations / manual actions that may need addressing.
+
      <li>An evidence file is created with all test data from the Pre-Assessment.</li>
 +
      <li>Three documents per selection pair are available for download:
 +
        <ul>
 +
          <li><i>tranzman_Assessment_XXXXXXXXXX_origin-name_destination-name.odt</i></li>
 +
          <li><i>tranzman_Engagement_Plan_XXXXXXXXXX_origin-name_destination-name.odt</i></li>
 +
          <li><i>tranzman_Environments_XXXXXXXXXX_origin-name_destination-name.odt</i></li>
 +
        </ul>
 +
        <p>These <i>.odt</i> files can be viewed/edited using MS Word or LibreOffice.</p>
 +
      </li>
 +
    </ol>
 +
    <div style="display:inline-block; box-shadow:5px 5px 10px grey; margin:1em 0;">[[File:Pre_assessment_generate_report.jpg | 700px]]</div>
 +
  </div>
  
 +
  <div style="background-color:#eff8f0; padding:1.5rem; border-radius:8px; box-shadow:0 2px 4px rgba(0,0,0,0.06); margin-bottom:2rem;">
 +
    <h2 style="border-bottom:2px solid #c8e6c9; padding-bottom:0.5rem; font-size:1.5em;">Editing & Working on Issues</h2>
 +
    <ul style="font-size:1.1em; margin-left:2em;">
 +
      <li>Edit the document only to add info on highlighted issues.</li>
 +
      <li>For merges, combine multiple documents into one.</li>
 +
      <li>Customer is responsible for resolving issues identified in the report.</li>
 +
      <li>Unresolved issues before migration: deselect affected components (Tranzman cannot migrate invalid/inconsistent components).</li>
 +
      <li>Multiple issues may impact project dates; consider change control procedures.</li>
 +
    </ul>
 +
  </div>
 +
</div>
  
βˆ’
===Analysing <b>Pre-Assessment</b> report===
+
<div style="display:flex; justify-content:space-between; margin-top:2rem; padding:1rem; background-color:#ffffff; max-width:90%; margin: 2rem auto 0;">
βˆ’
 
+
  <div style="text-align:left;">
βˆ’
Click on [[File:RefreshButton.JPG | border|40x40px]] and this should start the Assessment job.The page will show the progress of the Assessment job. Wait for the job to finish.
+
    [[Image:prev_icon.jpg|30px|link=Selections]] [[Selections|Previous]]
βˆ’
 
+
  </div>
βˆ’
 
+
  <div style="text-align:right;">
βˆ’
[[File:Assessmentprogress.JPG | border|1100x800px]]
+
    [[Image:next_icon.jpg|30px|link=Devices]] [[Devices|Next]]
βˆ’
 
+
  </div>
βˆ’
 
+
</div>
βˆ’
===Step 3===
 
βˆ’
 
 
βˆ’
Once Pre-Assessment is finished the webpage should look like below where there will be two sections of Issues and Limitations.
 
βˆ’
 
 
βˆ’
Both sections of Issues and Limitations are further categorise in to Origin and Destination with respect to the test cases.
 
βˆ’
 
 
βˆ’
Any inconsistency in either Origin or Destination will be seen with a [[File:Warning.JPG | border|20x20px]] icon.
 
βˆ’
 
 
βˆ’
Make sure to resolve all the highlighted inconsistencies before proceeding with the migration.
 
βˆ’
 
 
βˆ’
 
 
βˆ’
 
 
βˆ’
[[File:Pre-AssessmentPage.JPG | border|1100x800px]]
 
βˆ’
 
 
βˆ’
 
 
βˆ’
===Step 4===
 
βˆ’
 
 
βˆ’
Pre-Assessment also enables you to review your backup <b>Environments</b> configurations and <b>Migration Plan</b>  
 
βˆ’
 
 
βˆ’
To view the <b>Migration Plan</b> go to <b>Validation->Migration Plan</b>.
 
βˆ’
 
 
βˆ’
 
 
βˆ’
[[File:MigrationPlan.JPG | border|1100x800px]]
 
βˆ’
 
 
βˆ’
 
 
βˆ’
To view summary of backup <b>Environments</b> go to <b>Validation->Environments</b>.
 
βˆ’
 
 
βˆ’
 
 
βˆ’
 
 
βˆ’
[[File:Environments.JPG | border|1100x800px]]
 
βˆ’
 
 
βˆ’
 
 
βˆ’
 
 
βˆ’
Note :- All the above steps are similar irrespective of type of migration.
 
βˆ’
 
 
βˆ’
 
 
βˆ’
 
 
βˆ’
 
 
βˆ’
----
 
βˆ’
{| class="wikitable"  style="margin:auto;width:100%;color:blue;text-align:center;borderstyle=ridge;"
 
βˆ’
|-
 
βˆ’
| [[Image:prev_icon.jpg|30px|link=Selections]]
 
βˆ’
|| [[Image:next_icon.jpg|30px|link=Devices]]
 
βˆ’
|}
 

Latest revision as of 06:10, 12 September 2025



Pre-Assessment Report Overview

The Tranzman Appliance streamlines pre-validation and site surveys using automated checks in the TZM Pre-Assessment.
This process helps consultants identify and resolve pre-existing issues in the backup environment before migration begins.

Assessment Checks & Usage

  • The number of checks depends on the migration personality and the origin/destination environments.
  • Same Vendor Migration includes additional checks. Always use the latest patch for new checks.
  • For SPLITS or MERGERS, verify results for each migration pair. Take care when merging objects with the same name.
  • If no immediate fix is available for an issue, Stone Ram Support will add new checks to notify in advance as part of Pre-Assessment.

πŸ›ˆ Always run the latest patch to benefit from the newest checks and notifications.

Running Pre-Assessment

  1. Navigate to Tasks → Pre-Assessment in the TZM web UI and click Start Pre-Assessment.
  2. Multiple checks are run; tests can be rerun to verify failed tests.
  3. The Logs icon provides the latest assessment activity logs.
Pre assessment.jpg
Pre assessment result.jpg

NetBackup-to-NetBackup Migration Checks

  • 28 Individual Checks for pre-existing issues in origin or destination.
  • 17 Comparison Checks for migration component issues between origin and destination.
  • 17 Advisory Checks for environment limitations (may require manual actions).
  • 9 Advisory comparison checks for limitations/manual actions that may need addressing.

Analysing Pre-Assessment Report

  • Red triangle: Issue to resolve or acknowledge (click for details).
  • Grey check: Test ran without issue.
  • Grey dash: Test not applicable/skipped.
  • Blue info: More information, not critical.
  • Green check: Test acknowledged.

Note: All Red triangle issues must be resolved, retested, or acknowledged before starting migration.

Pre assessment analyse.jpg

Generating & Downloading Pre-Assessment Report

  1. Go to Tasks → Download and click Generate documents to create the Pre-Assessment report.
  2. Report is generated only during the Selections phase.
  3. An evidence file is created with all test data from the Pre-Assessment.
  4. Three documents per selection pair are available for download:
    • tranzman_Assessment_XXXXXXXXXX_origin-name_destination-name.odt
    • tranzman_Engagement_Plan_XXXXXXXXXX_origin-name_destination-name.odt
    • tranzman_Environments_XXXXXXXXXX_origin-name_destination-name.odt

    These .odt files can be viewed/edited using MS Word or LibreOffice.

Pre assessment generate report.jpg

Editing & Working on Issues

  • Edit the document only to add info on highlighted issues.
  • For merges, combine multiple documents into one.
  • Customer is responsible for resolving issues identified in the report.
  • Unresolved issues before migration: deselect affected components (Tranzman cannot migrate invalid/inconsistent components).
  • Multiple issues may impact project dates; consider change control procedures.
   Prev icon.jpg Previous
   Next icon.jpg Next